| Symbol | - |
|---|---|
| Unit | -- |
| Attribute-ID | load_spectra_for_gear_shift_time_share |
| Numeric ID | 17409 |
| Value Type | PMTechArray |
For a load spectrum calculation, the time shares for each configuration must be entered. According to these time shares, the entered total operating time of the transmission is distributed to the individual gears.
The operating time of a configuration is determined from the weighting factor divided by the sum of all weighting factors times the total operating time. This means that the time shares can be entered using percentages, factors or hours. The following entries thus lead to the same result:
| Configuration | Factor | Factor | Percentage | Hours |
| 1 | 0,1 | 2 | 10 | 3000 |
| 2 | 0,2 | 4 | 20 | 6000 |
| 3 | 0,7 | 14 | 70 | 21000 |
If existing percentage or hourly values are used for the weighting factors, the total does not have to be 100% or equal to the total number of hours. If the specified total number of hours for the above table were 60000 h instead of 30000 h, the individual time shares would be converted internally to 6000 h (1. cofig.), 12000 h (2.
cofig.
) and 42000 h (3.
cofig.
).