| Symbol | Fp |
|---|---|
| Unit | N |
| Attribute-ID | initial load |
| Numeric ID | 510 |
| Value Type | PMTechValue |
If a preload force is used to define an axial preload for a bearing arrangement, the preload forces acting on the outer rings of the braced bearings must be indicated with the correct sign. The specified preload forces must also lead to an actual preload. A preload force can not be used to define an increase in the axial clearance.
| sP | Preload distance |
| FP | Preload force |
Note: For adjusted bearing arrangements, the preload force must be entered with the correct sign on both bearings. A preload distance is determined from the specified preload force for the unloaded state and is used for further calculations. The possibility that the spring preload distance may be exhausted under the operating load is not considered. In this case, a separate calculation must be performed without spring preload force.